Germany · Preparatory work 1989 · Field trial 1990

Drewitz Military Airfield

Rapid repairs without relocating the air unit

Damaged concrete airfield pavements needed to be repaired quickly. The key requirement was that the air unit based there had to be able to remain on site.

Visualisation showing a PAG slab being installed during rapid runway repairs at Drewitz Military Airfield.
Visualisation of rapid runway repairs using PAG slabs at Drewitz Military Airfield.
01

Role and responsibility

Frank-Michael Adam was the responsible staff officer on the client side within the Air Forces/Air Defence Command (LSK/LV). He proposed incorporating existing PAG precast prestressed concrete slabs into an integrated rapid repair method.

02

Contribution to the project

In 1989, Adam laid the technical and procedural groundwork for maintaining, repairing and reconstructing runways and aircraft shelters. He combined development of the technical solution with planning its implementation. The method used available PAG slabs. A road construction company specialising in airfield pavements carried out the detailed design and construction work.

03

Field trial

The first field trial in Drewitz in 1990 covered five damaged areas within 14 days. It confirmed that the method worked without requiring the air unit to relocate.

Which decision do you need to make?

Briefly describe your project, the decision ahead and your timeframe. In an initial conversation, we will clarify the question, the information available and whether independent advice is the right next step.

Write to Frank-Michael Adam

LinkedIn profile

Prof. em. Dr.-Ing. habil.
Frank-Michael Adam

Frankfurt am Main, Germany · International assignments

German · English · Russian

Telephone+49 151 5624 8893