Prof. em. Dr.-Ing. habil.Frank-Michael Adam
Back to selected workHistorical project

Russia · 1990s

Project MODUL

Factory-produced housing for Russian military personnel

The withdrawal of Russian forces from Germany created an urgent need for housing for returning military personnel and their families. The MODUL programme addressed this need with factory-produced housing units that could be assembled rapidly on site.

MODUL: historical buildings, volumetric modules and construction sites, presented in an AI-assisted visualisation.
Visualisation of historical buildings and volumetric modules, with an overview of construction sites. Prepared with AI assistance using historical MODUL material.
View historical project material (PDF)
01

Project and scope

The programme was implemented by the Russian Ministry of Defence together with the Russian company Konversion-Wohnen and the German modular construction company BUK. A German government loan supported the financing and supply of the modular homes.

More than 4,000 apartments were built at around 50 locations across Russia. Most buildings were two storeys high, with approximately eight to ten apartments each, constructed from factory-produced volumetric modules. The historical project material documents the widely dispersed construction sites and the transport and logistics routes needed to serve them.

02

Frank-Michael Adam’s role

Frank-Michael Adam and ADAM: bauservice international supported the programme with technical assessments and ongoing specialist advice. A key focus was adapting the German modular construction system to Russian regulations and technical standards, and assessing structural design, assembly, quality and fitness for use.

Several technical reports were produced for MODUL, including assessments of different modular house types and construction phases in 1998 and 1999.

The project informed his academic research. He obtained the degrees of Dr.-Ing. (2001) and Dr.-Ing. habil. (2005).

03

Outcome

MODUL combined industrial prefabrication, international logistics, adaptation to Russian technical requirements and the construction of large numbers of residential buildings across many locations. Subsequent inspections and monitoring of the completed buildings provided further insights into the technical quality, safety and long-term use of modular buildings.

Which decision do you need to make?

Briefly describe your project, the decision ahead and your timeframe. In an initial conversation, we will clarify the question, the information available and whether independent advice is the right next step.

Write to Frank-Michael Adam

LinkedIn profile

Prof. em. Dr.-Ing. habil.
Frank-Michael Adam

Frankfurt am Main, Germany · International assignments

German · English · Russian

Telephone+49 151 5624 8893